Trusted but Verify
Current checks include security-provider warnings. Review the detected warnings and supporting trust evidence before relying on the site.
Trust signal radarNormalized trust signals for wbs.hrDomain Maturity: 1096 daysDomain MaturityWarning Cleanliness: 1 detectionsWarningCleanlinessSafety Level: 0 negative tagsSafetyLevelPositive Signals: 3 positive signalsPositiveSignalsPopularity: Estimated low traffic without Tranco or social profile dataPopularityTrust Zone: .hrTrust ZoneOperational Signals: 1 detected servicesOperationalSignalsLocation Credibility: Hosting country HRLocation Credibility
Figure 1. Trust signal radar for wbs.hr. Larger shaded area indicates stronger trust signals.
How we scored wbs.hr
Tech signals:
React Platform, Next.js Framework
Positive signals:
a long-term SSL certificate (7 months)
a long-term domain history (3 years)
multi-language support
Negative signals:
security-provider warnings
Last checked September 18, 2026 at 11:45 AM by
Gridinsoft Trust Model v2.5.4
This domain was registered September 17, 2023 at 10:00 PM through the company Hrvatski Telekom d.d. (Regica.net)
and ownership information is not publicly available.
Complaint contact not found.
About wbs.hr
We reviewed wbs.hr and found mostly positive signals. Current checks lean toward a legitimate, lower-risk profile, although a few caution points still keep it short of a fully verified standing. The current trust score is 79/100. Key signals include security-provider warnings, a long-term SSL certificate (7 months), and a domain age of 3 years. Verify key details before sharing personal information or relying on the site for important actions.
Figure 2.
Website screenshot for Wbs.hr.
2026-09-18 14:45:58
FAQ
Is wbs.hr safe?
Based on current analysis, wbs.hr appears to be generally safe. Signals such as security-provider warnings and a long-term SSL certificate (7 months) support this assessment. Basic verification is still reasonable before relying on the site.
Why does wbs.hr look trustworthy?
Key factors include registrar information (Hrvatski Telekom d.d. (Regica.net)) and hosting in US. The trust score blends security detections, domain and infrastructure signals, and on-page behavior patterns. Taken together, these factors support a mostly positive trust assessment, although routine verification is still reasonable.
Wbs Digital Footprints
A structured view of the site's detected themes, page signals, and related online footprint elements.
React Platform
This website is built using React, a popular JavaScript library for creating interactive user interfaces.
Multilanguage
The website provides multi-language support, demonstrating international accessibility and commitment to diverse user populations. Multi-language implementation typically indicates professional development standards and global operational scope, representing a positive trust indicator.
Google Tag Manager
The wbs.hr website uses Google Tag Manager to add and update tracking tags on its website.
Webpack Module Bundler
Next.js Framework
Long Term SSL Certificate
The SSL certificate for this site is valid for more than 6 months, indicating a long-term commitment to security and trust.
Long Term Domain
This site is registered for an extended period, which is generally a positive continuity signal.
External provider warnings: 1/25
This section shows what independent external security sources say about this site.
A warning appears when one or more sources report malware, phishing, abuse, or other safety concerns. Each row shows the source and its verdict.
If no source reports a warning, the site is shown as clear in this section.
Webroot
Malicious
External provider results for Wbs.hr, last checked September 17, 2026.
โ VirusTotal
Domain Information
CreatedSeptember 17, 2023 at 10:00 PMExpires: September 17, 2027 at 10:00 PM
Verified ServicesThis domain has been verified by the following legitimate services and organizations, confirming authentic ownership and proper email security configuration.
Google Verification
Domain ownership verified by Google.
Security FingerprintUnique identifier based on site analysis
If you own Wbs.hr and want to challenge the trust score, please submit a review request via portal.gridinsoft.com. There you can claim your profile and add verified company/contact details. If you cannot access the portal, email legal(at)gridinsoft.com with proof of legitimacy and contact details. We never charge website owners for reviews or reconsideration requests. For more information, please review our Disclaimer.
A website report warns you. A PC scan protects you.
Unsafe sites can leave adware, unwanted apps, or hidden malware in downloads and browser settings. Run Gridinsoft Anti-Malware to check what may already be on this Windows PC.
Checks active threats, startup items, and suspicious downloads
Finds adware and unwanted apps linked to unsafe websites
Shows scan results before you decide what to remove
Your comment is currently undergoing moderation and will be published shortly.
Help protect others by sharing this page on social media! The more people who know about wbs.hr, the fewer chances they have to deceive someone else.Help others evaluate wbs.hr by sharing this page on social media!
Help protect others by sharing this page on social media! The more people who know about wbs.hr, the fewer chances they have to deceive someone else. Help others evaluate wbs.hr by sharing this page on social media!